Project Identification
- Project Reference Number
- WR/STMA/DACF/WKS/NCT/002/2025
- Project Name
- CONSTRUCTION OF PROPOSED 2-UNIT KG BLOCK WITH CONCRETE ROOF FOR SEKONDI MODEL SCHOOL AT SEKONDI
- Sector
- Education
- Sub sector
- Basic Schools
- Project Type
- New Construction
- Project Location
- Western Region
- Purpose
- To provide a safe, conducive, and adequate learning environment for kindergarten pupils at Sekondi Model School
- Project Description
- CONSTRUCTION OF TWO (2) UNIT BLOCK, OFFICE, AND STORE ROOM WITH CONCRETE ROOF, 3-SEATER WC TOILET WITH OVERHEAD STAND AND TANK, DRAINS, APRONS, AND SEPTIC TANK
4
Quality Education
Project Preparation
- Project Scope
- CONSTRUCTION OF TWO (2) UNIT BLOCK, OFFICE, AND STORE ROOM WITH CONCRETE ROOF, 3-SEATER WC TOILET WITH OVERHEAD STAND AND TANK, DRAINS, APRONS, AND SEPTIC TANK
- Environmental Impact
- Minor construction and dust noise; mitigated by dust screening and restricted working hours.
- Social Impact
- No involuntary resettlement; long-term positive impact on school access.
- Land and Settlement Impact
- Built on existing school land owned by the Assembly; no resettlement required.
- Design Standard
- GES standard 2-Unit classroom design; Ghana Building Code 2018.
- Funding
-
DISTRICT ASSEMBLY COMMON FUND (DACF)
Public Payment
- Project Budget
- GHS 1,414,840.45
- Project Budget Approval Date
- Wed Jul 30 2025
- Contact Details
-
info@stma.gov.gh
Tender Management
Initiation
- Procuring Entity
- Sekondi-Takoradi Metropolitan Assembly
- Procuring Entity Contact Details
-
info@stma.gov.gh
- Procurement Method
- Open Competitive Tendering
- Process Description
- CONSTRUCTION OF TWO (2) UNIT BLOCK, OFFICE, AND STORE ROOM WITH CONCRETE ROOF, 3-SEATER WC TOILET WITH OVERHEAD STAND AND TANK, DRAINS, APRONS, AND SEPTIC TANK
Award
- Number of Firms Tendering
- 1
- Cost Estimate
- GHS 1,420,465.50
Contracting
- Contract Administrative Entity
- Sekondi-Takoradi Metropolitan Assembly
- Contract Type
- Works
- Contract Title
- CONSTRUCTION OF PROPOSED 2-UNIT KG BLOCK WITH CONCRETE ROOF FOR SEKONDI MODEL SCHOOL AT SEKONDI
- Contract Identification
- WR/STMA/DACF/WKS/NCT/002/2025
- Contract Price
- GHS 1,414,840.45
- Contract Scope of Work
- CONSTRUCTION OF TWO (2) UNIT BLOCK, OFFICE, AND STORE ROOM WITH CONCRETE ROOF, 3-SEATER WC TOILET WITH OVERHEAD STAND AND TANK, DRAINS, APRONS, AND SEPTIC TANK
- Contract Start Date
- Tue Oct 28 2025
- Contract Duration
-
From: Tue Oct 28 2025
To: ongoing
| # | Name of Firm | Role |
| 1 |
IHLASS CONSTRUCTION LIMITED |
Lead Contractor |
- Contract Status
-
Active