CONSTRUCTION OF SIX (6) SEATER WATER CLOSET TOILET FACILITY, DRILLING OF MECHANIZED BOREHOLE, AND OVERHEAD WATER STAND, TANK, SEPTIC TANK, DRAINS, AND APRONS.
| # | Name of Firm | Role |
|---|---|---|
| 1 | PHLYBEN GROWFAST COMPANY LIMITED | Lead Contractor |
This project is disclosed by Sekondi-Takoradi Metropolitan Assembly. Citizens have the right to ask questions about public infrastructure.